- Anti-seawater Paint
- Floor paint
- Floor paint
- Anticorrosion Epoxy Paint
- Epoxy Paint
- Anticorrosion Epoxy Asphalt Paint
- Anticorrosion Paint
- Anticorrosion Glass Flake Paint
- Epoxy Zinc Primer
- Zinc Primer
- Alkyd Enamel
- Alkyd Primer
- Alkyd Iron Oxide Red Primer
- Latex paint XB-2
- Latex paint XB-1
- Acrylic Paint
- Polyurethane Primer
- Anticorrosion Polyurethane Primer
- Anticorrosion Paint YA-2
- Anticorrosion Paint YA-1
- Chlorinated rubber Coating
- Chlorinated rubber Paint
- Anticorrosion sulfonated Polyethylene Paint
- Chlorinated Rubber Paint
- Chloride Enamel
- Chlorinated Polyethylene Paint
- High Temperature Resistant Paint
- High temperature resistant paint HT-1
- Epoxy Paint
- Alkyd Paint
- Latex Paint
- Acrylic Paint
- Polyurethane Paint
- Anticorrosion Paint
- Chlorinated Rubber Paint
- Chlorinated Polyethylene Paint
- High Temperature Paint
Floor paint
Introduction
Floor paint made from epoxy resin, modified resin, activity agent, additives, etc. The product is a long lasting anticorrosion paint, as well as high adhesive strength, tight structure, high impact resistant, pulverization of salt resistant, chemical air resistant, etc. The floor paint can make the floor good looking and long lasting; it is used for floor only.
Floor paint:Technical indicators:
| No. | Item | Experimental Reference | PF-5 |
| 1 | Gloss | GB1743-79 | 88% |
| 2 | Adhesion | GB1720-79 | 1 |
| 3 | Hardness | GB1730-79 | 0.76 |
| 4 | Impact Strength | GB1732-79 | 50cm |
| 5 | Flexibility | GB1731-79 | 1mm |
| 6 | Wearability | GB1768-79 | 9.7mg |
| 7 | Impact resistance | B-30A Tester,30kg/m | Good |
| 8 | Pressure experiments | GT-200 Tester, 2500N/cm2 | Good |
| 9 | Pull test | GT-200 tester | 290N/cm2 |
| 10 | Pressure | Forklift press for 50 times | No change |
| 11 | Water resister | GB1733-79, 7days | No change |
| 12 | Pulverization of salt | GB1771-79,1000h | No change |
| 13 | brush | TLXY Tester, 2000times | No change |
| 14 | 45# petrol | GB1734-79, 30days | No change |
| 15 | 200#Petrol | GB1734-79,30days | No change |
| 16 | diesel oil | GB1734-79,30days | No change |
| 17 | Temperature | 1050C to 50C, for 3cycles during 16h | No change |
| 18 | H2SO4 | GB1763-79, 20% H2SO4, 20days | No change |
| 19 | NaOH | GB1763-79, 20%, 30days | No change |
Specifications:
Color: many kinds
Specific Gravity: 1.1
Dosage: 0.35kg/m2
The Thickness: 180um (wet)
The Thickness: 60um (dry)
Ratio: 3:1 (A:B)
Application Methods: bush, roll, spray
Solvent: Special
Surface Dry: 4hours, 23degree(2degree)
Hard Dry: 24hours, 23degree (2degree)
Solidify: 7days
The Interval between two washing:
48hours (shortest time), 15degree-25degree
30days (longest time), 15degree-25degree24hours (shortest time), 25degree-30degree
20days (longest time), 25degree-30degree
Duration period: 6months
Flash Point: 24degree
Formula 1:PF-6 Floor Paint
| No. | items | Specifications | Thickness(um) |
| 1 | closed layer | Lacquer | |
| 2 | Bottom layer | Lacquer +1# filling | 600-2400 |
| 3 | Middle layer | Lacquer +2# filling | 300-500 |
| 4 | Surface layer | Glossy coating | 100 |
| Total thickness | 1000-3000um | ||
Notice:
You should prepare the following material before you paint.
a. H52-84 floor paint
b. H52-84 lacquer
c. H52-83 solvent
d. 1# filling, 2# filling 3# filling
Ratio:
H52-84 lacquer (It made of two different parts): 3:2(A:B)
H52-84 paint (It made of two different parts): :1(A:B)
Formula:
| PF-7 floor paint | 1# filling | 2# filling | 3# filling | PF-7 solvent | |
| Closed layer | 70-100 | ||||
| Bottom layer | 380 | 10 | |||
| Middle layer | 200 | 5-10 | |||
| Surface layer | 100 | 200 |
Floor:
a. The floor should meet the GB50209-95 Standard
b. the concrete floor should paint 3 weeks (summer) after finished, in winter need 6 weeks.
c. before painting the floor must flatted, clean and dry.
d. bottom layer is not allowed, unless the closed layer have painted for 30 minutes.
e. the pain can be painted 20 minutes after mixed, the dry time will last 24hours(232degree).
f. the pain can be painted 20 minutes after mixed, the dry time will last 24hours(232degree).
g. the pain can be painted 20 minutes after mixed, the drying time will last 7 days(232degree).
h. Painting is not allowed when temperature below 10 degree and humidity more than 85%.
i. Other substance is not allowed to mix into the paint, and the paint should be use up to 4 hours.
j. Dangerous material, please keep it safe.
k. Please read the introduction carefully before use.

- Anti-seawater PaintAnti-seawater PaintAnti-seawater Paint(primer, coating)Introduction Anti-seawater paint (primer, coating) is made of two parts, both primer andcoating

- High Temperature Paint High Temperature PaintHigh temperature resistant paint is made from silicone resin, high temperature dye, filling and additive. The product is a high

- Chlorinated Polyethylene Paint Chlorinated Polyethylene PaintWe are a China interior and exterior paint manufacturer,our chlorinated polyethylene paint is mainly used in in petroch

- Chlorinated Rubber Paint Chlorinated Rubber PaintWe are a China rubber coating supplier. Chlorinated rubber paint is made from sulfonated polyethylene, resin, plasticizer, so

- Anticorrosion Paint Anticorrosion PaintWe specialize in manufacturing anticorrosion paint. Anticorrosion paint (primer) is made of two different parts (A,B). This is mad


United Kingdom


English