- Ready-mixed Concrete Mixing Plant
- Wet Concrete Cleaning and Separating Equipment(Concrete Recycling Equipment)
- Burner
- Asphalt Mixing Plant
- Concrete Mixing Plant
- Asphalt and Cement Mortar Mixing Truck
- Dry Mortar Mixing Plant
- Modular Concrete Mixing Plant
- Container Concrete Mixing Plant
- Skipped Concrete Mixing Plant
- New-type HYCM Mobile Concrete Mixing Plant
- Coal and Oil Burner
- Soil Mixing Plant
- New-type HYZM Mobile Concrete Mixing Plant
- HYZM Mobile Concrete Mixing Plant
- Mobile Concrete Mixing Plants
- Low Pressure Oil Burner
- Special Concrete Mixing Plant for Express Railway
- HYAHRP Asphalt Hot Recycling Plant
- HYA/HYM/HYP Asphalt Mixing Plant
Coal and Oil Burner
Coal and Oil Burner
Our company successfully researched and developed coal and oil burner which is used as a creative product in mixing equipment. This type of burner can not only achieve high pressure flow of coal and powder but also atomization of light oil and heavy oil.
The outstanding advantage of coal and oil burner is, to largely reduce the fuel cost under stable and reliable working condition. Following table are the differences in costs of diesel, heavy oil, coal powder and lump coal needed to produce one ton of qualified asphalt mixture.
Price difference contrast table 1
Item | Diesel | Heavy oil | Coal powder | Lump coal |
Fuel unit price (/Kg) | 5.2 | 3.4 | 0.9 | 0.43 |
Fuel consumption (Kg/t) | 6 | 7 | 12 | 12 |
Fuel cost () | 31.2 | 23.8 | 10.8 | 5.16 |
Price difference (/t) | Diesel | Heavy oil | Coal powder | Lump coal |
Diesel | - | -7.4 | -20.4 | -26.04 |
Heavy oil | -7.4 | - | -13 | -18.64 |
Coal powder | -20.4 | -13 | - | -5.64 |
Lump coal | -26.04 | -18.64 | -5.64 | - |
From table 1, it is clear that price differences are very obvious: price difference between coal powder and heavy oil is 13yuan/ton, while the price difference between lump coal and heavy oil is 18.6yuan/ton.
Next, take HYB3000 asphalt mixing plant for example, if it uses different fuels from normal burner, price difference contrast are as follows (10 hours/day)
Price difference contrast table 2
Item | Diesel | Heavy oil | Coal powder | Lump coal |
Fuel unit price (/Kg) | 5.2 | 3.4 | 0.9 | 0.43 |
Fuel consumption for producing 1 ton finished product (Kg/t) | 6 | 7 | 12 | 12 |
Fuel consumption (Kg/h) | 1400 | 1680 | 2880 | 2880 |
Total Hours | 10 | |||
Fuel cost (/day) | 74880 | 57120 | 25920 | 12384 |
Price difference for producing 1 ton finished product (/t) | Diesel | Heavy oil | Coal powder | Lump coal |
Diesel | - | -17760 | -48960 | -62496 |
Heavy oil | -17760 | - | -31200 | -44736 |
Coal powder | -48960 | -31200 | - | -13536 |
Lump coal | -62496 | -44736 | -13536 | - |
From the contrast of above two sets of data, coal burner can save a large part of fuel cost compared with traditional oil burner. Our B coal and oil burner features practibility and adapbility. Our product has large economic value and social benefit!

- New-type HYCM Mobile Concrete Mixing Plant New-type HYCM Mobile Concrete Mixing PlantHYCM60/HYCM50/75 Mobile Concrete Mixing Plant (New type) 1. FeaturesHYCM/S Mobile concrete mixing plant

- Skipped Concrete Mixing PlantSkipped Concrete MixingPlant Based on the creative design principle, Skipped concrete mixing plant is widelyused in concrete constructions or concrete

- Container Concrete Mixing PlantContainerConcrete Mixing PlantConvenient transportation, easy, fast installation and removal, suitable forconstruction site of frequent transitions. S

- Modular Concrete Mixing PlantModular Concrete MixingPlantHYCP modular concrete mixing plant is always used in concrete production orcivil engineering area, such as construction of

- Dry Mortar Mixing PlantDry Mortar Mixing Plant Leading the New Concept of Mixing High Efficiency/Low EnergyConsumption/Environmental Protection As a new type green construct


United Kingdom


English
Français
Русский
العرب